This includes laying out lines, mounting junction boxes, pulling wiring, and setting up the electrical panel, grounding, and overhead service wire. This wiring is not connected to any devices, outlets, or switches during the rough-in. This step is last in the rough-in as it is the easiest to work around ductwork and plumbing.
No video Answer Now
Was this helpful?