The selection of heating and cooling equipment is dependent on accurate heating and cooling load calculations. From this point onward, in the design process, the actual performance data of the equipment selections and room-by-room loads from the Manual J calculations should be used to design the duct system.
No video Answer Now
Was this helpful?