How long does it take to rough-in a new HVAC system?

1 Answers

Write Your Answer

The HVAC contractor should have taken care of pressure testing and final inspections after the rough-in is completed. Plumbing rough-in should take between 3 – 5 days, barring any problems. When you’re looking for an HVAC contractor, call 408-295-2182 to arrange an on-site estimate.