After the the lines are purged the recovery machine is ready to be turn on. The recovery tank valve along with all other valves should be open, the recovery machine can be turned on. At the HVAC gauges and recovery machine you should see the pressure begin to drop as the refrigerant goes into he recovery tank.
No video Answer Now
Was this helpful?